(Well, mostly. Regener's Rule #7. Always be more or less specific)

Wednesday, September 12, 2012

CSI CONSTRUCT2012 Keynote Address - Empowering Sustainable Reconstruction


Phoenix sure knows how to capture our attention to open the keynote, with a Hopi Indian dance.

KEYNOTE ADDRESS
"Empowering Sustainable Reconstruction"
Dr. Tracy Kijewski-Correa, University of Notre Dame Civil Engineering, and co-founder of Engineering2Empower


"We knew it was a problem, but it was just too difficult to solve." This is the unfortunate prevailing approach to seismic issues in Haiti preceding what is now the largest disaster in modern history. A recurring culprit is masonry, unreinforced, and intersected by haphazard columns.


In a nation that is deforested, you don't have much wood for formwork. Also not enough reinforcing was used. 

Confined masonry was not typically used, costing twice as much. The goal of a safe home was completely unattainable.


Two immediate questions:
 - How to make sure this never happens again?
 - How to repair that block over there?

In the U.S. we adjust our codes and standards and reduce repeating failures. Because we have a strong government and educational pipeline, engineers available and a strong economy. But in many places like Haiti those fundamental underpinnings are missing. 

Best question 
 - Why did they over-rely on block in the first place?

To answer, first listen. What were the underlying factors in how they built? 
 1. Resiliency
 2. Feasibility

Construction materials at their disposal where heavy, attracting more seismic force. Blocks were hand-pressed. Stones were smooth and round. Concrete mixed on the ground, eyeballing proportions.

Understand the market. Homeowners could not afford engineering services like we have, and not workers like we have in the US - they could not even afford the most qualified local workers. They could save every day for the rest of their lives and not be able to afford a safe home. No mortgages or insurance. You just build block by block every chance you have a little money.

Need to also ask, what would add:
 3. Sustainability
 4. Viability

Need a single family home, 3 bedrooms, porch, good ventilation, cool interior, hurricane and earthquake resistant, security, and appearance of modern block home.


Empowerment model - includes those 4 pillars

Held a community meeting

The top 4 solutions all included concrete unit masonry. Not the answer we wanted to hear.
Are the top solutions the same as the ones that killed so many people?!

So we decided to innovate.

Looking at the early colonial structures they had, that actually outlasted the block homes, they were built with a wood structural frame. But they didn't have wood anymore.

So we proposed using what steel reinforcing they have and coupling it with proper building standards to make a durable structural frame, and adding lightweight concrete panels. Using prefabrication at a depot to ensuring that assemblies meet seismic detailing requirements. And paraskilling to make sure workers are efficient and skilled at their tasks. Introduced communal materials like reusable formwork, and equipment like mixers.
Prefabrication helps fill in for lack of strong government. Paraskilling helps make up for lacking education. Standardized design helps with lack of engineering availability. Communal materials and equipment help address the extreme need for economical solutions.

Actually ended up cheaper than block construction. But we also had to be sure this type of house is something the Haitian families would want to live in. Learned a few things that helped change the design. Made it modular so they could begin with 2 rooms, and add more later. The interior panels could actually be detached and redesigned. This gives the homeowners a sense of empowerment. But still not really enough until the whole community was understanding and accepting the solutions, so they could become the voice not me. Self-financed recovery is stronger than continual dependence. So partnered with local groups such as CURL to make sure the solutions worked for them and would have deep roots in the community. Also gave encouragement to residents to save what they could regularly, using messaging through their cell phones to communicate their saving patterns and getting feedback on how soon they could meet their goals for new homes. This further strengthened empowerment in a sense of a social network on the streets that somebody is offering a way out, not a handout.



There are silent Haiti's all over the world, waiting for the next disaster. 

CONSTRUCT2012 Education Session W01 - Avoiding problems with floor finishes on conc slabs


CSI CONSTRUCT2012
Avoiding problems with floor finishes on conc slabs
Emily R. Hopper, Peter Nelson of Simpson, Gumpertz & Heger, structural engineers and building science
Wed 9/12/2012 8:00

Adhesive failures
- moisture, or ph. Adhesive oozes.
- or edges of vct curls.

Wood flooring
- dimensional change problems
- biological degradation - mold/mildew

Carpet
- debonding
- phthalates released

Resinous terrazzo
- debonding
- curling
- blistering

Silicates
- surface of floor becomes hygroscopic, wet, slippery

Concrete e.g. Exposed agg or ground face
- alkali silica reaction

Why?
- Change in government regulations and sustainable design requirements. We no longer use asphalt cutback adhesive. Need to meet VOC limits. So we're using water-based adhesives, that fail when they are re-wetted.
- Increased use of pozzilans e.g. fly ash
- Lightweight conc saves a lot in steel framing and increases fire ratings. But lightweight aggregate takes twice as long to dry. E.g. 160 days instead of 80 (may vary depending on thickness of conc).
- if any significant rain is allowed to fall on the conc, you have to start the 80 or 160 days all over.
- Fast track construction
- Lack of or compromised vapor retarder below slab

Suggested solutions:
- Require low w/c ratio
- Consider requiring plastic moisture retaining curing covers , and not allowing curing compounds, burlap, and definitely not continuous water fog curing.
- Avoid blotter layer. It usually becomes a bathtub, in spite of the best intentions.
- {Make CA staff aware to} expect to see many not just one calcium chloride tests. See the spacing requirements in the ASTM. Three tests for first 1,000 sq ft. One more for each additional 1,000 sq ft.
- {Make CA staff aware to} expect to see where they ground away any curing compound or other surface treatment if any.
- regarding use of ASTM F 2170 Internal RH probe test, instead of ASTM F 1869 anhydrous calcium chloride test - most people do not have equipment that passes the standard's requirements for statistical error. A study was done of several mfr's probes, results were all over the place, and retested later and results weren't even consistent among a mfr's own probe.
- If this method is used, {make CA aware that} the tester needs to brush, vacuum, and repeat until there is no dust. And the report should show a number of things listed in the ASTM, including the make and model of tester and when it was last calibrated.

pH is a big issue too. But nothing can be done about it. Also since it requires moisture for it to be a problem, we expect ASTM will eventually say fix the moisture problems and you will fix the pH.

Who should do the moisture testing?

Who should hire the tester?

Recommend independent, hired by owner.

Intl conc repair institute (ICRI) now has a certification for testers.

Vented metal deck - don't use as a moisture mitigation strategy. Won't hurt but doesn't help much.

"Accelerate" drying of the slab - not much data

Install moisture mitigation system
- assume you are going to need it up front. So many factors, and not one person's responsibility
- consider an allowance, alternate, or unit price - {though after discussion, agreed somewhat with a plan to just include whatever methods the GC chooses to manage it in the base bid, with mitigation as one option}
- systems are not all created equally. See slide for types of moisture mitigation. Speaker believes best type are 100% solids epoxy based topical products that are pH tolerant, with 0.1 perms or less. {need to discuss further, may be too restrictive - perhaps 0.3, and retesting is the key.}
- include the shot blasting, and a special type of blotter layer for the coating(?),
- expect $5-10/sq ft, in the base bid.

Avoid:
- penetrating coatings,
- water-based types, will have the same problem we started with because they will break down from moisture.
- magic admixtures that will lock water in and can't be tested, cause pH and bonding problems and doesn't address cracks.

Tuesday, September 11, 2012

CONSTRUCT2012 Technical Tour - DIRTT


CSI CONSTRUCT2012 Factory tour of DIRTT demountable partitions.
They also offer access floor systems.

DIRTT = Doing it Right This Time
http://www.dirtt.net/



A panel can be removed in seconds using special prybar tool, to access electrical or other services, or change panels.


Wide range of designs to work with, very flexible, even a system of easily irrigated plant trays called Breathe living wall modules are available

Site assembled?
-yes
Therefore not unitized?
-correct, usually not unitized

Progressive or non-progressive?
-Non. (That is better - you can remove any panel without affecting adjacent panels.)

Fire and sound ratings available?
-Fire-no
-Stc 37-51

Are vinyl-free systems available?
-yes, they have a foil laminate over mdf that is highly cleanable.
-abs seals are available however they are not as resilient as PVC
-asked if they tried neoprene, will email Max

Wood veener species?
-teak, 30 species total
FSC Certified wood?
-available

Lunch-n-learns or webinars available

CONSTRUCT2012 Technical Tour - F L W - T W

Visited a certain famous architect's desert home/studio/school. We were greeted with a card that said not to take pictures, but then on closer inspection it seemed that maybe taking pictures of the exterior was OK if for personal use. So to be on the safe side, here is just one exterior picture, and I promise I'm in no way gaining from posting it here, it is for the enjoyment of me and my spec-geeky friends who were on the tour.
The harmony with nature is truly remarkable, and amazing if the roof doesn't leak since it is sheet metal that is in some places dead flat.

I don't need any trouble from the foundation so I will not even say who this famous architect is, but we really enjoyed the tour, and it inspires me to one day convince some apprentices to study specifications under the master and charge them for the privilege while they build a winter home for me and my wife, and when they are finished they can be cast out to sleep in tents.

Monday, September 10, 2012

SCIP Lunch Presentation - BIM and SCIP

BIM and SCIP
Presented by Mark Kalin, Kalin Associates Specifications
---
Sponsored by PPG
New products include:
Solarban 72
Sungate 400
---
There is work to do.
30 million bldgs needing work in the next few years.
5 million people move to cities every month.
The AGC is the #1 trainer for BIM in the country. They get it.
What should we do?
-meet with the BIM drivers
-with office BIM managers.
(be aware, the estimators will want to get more info from the model has in it, e.g. Sq ft of paint.
-lock in relationship - be their best buddy for finding the right spec#, etc. So they'll never need to go to somebody else or struggle through it themselves and have a poor result.
-review office BIM keynotes
-provide attributes of the BoD
-assemble manuf objects
-add attributes in model
-add as-built model info
-add attributes into spec

Our role is moving toward a dynamic one as a knowledge manager, from a static one as a specification writer.

We should be working with our BIM Managers to develop training for Reviteers who are plugging in manuf info & other bits into the model, to make sure when schedules are published and specs "refreshed" or otherwise updated, we aren't seeing some as 5-digit, some 6-digit, some no digit, some UniFormat, etc.

See Kalin website for the PowerPoint.

Currently, without working together, bids are apples, oranges, and elephants

[cid:0262BCBF-FE34-4557-B762-6A405127AE91]

SCIP Annual Meeting

Introductions.

Membership had declined but is rebounding.

Member benefits now includes a conferencing system.

SCIP has an official phone 818-390-7692.

    Please pass the matza

SCIP members, affiliates, and retired members are encouraged to participate in the online discussion groups such as the CSI Specifications Practice Group.



SCIP is the voice of the specifications community and works as a complimentary organization with CSI, not in competition with CSI. Going back 20 years ago, SCIP did not have nearly this level of acceptance from CSI. But in the last few years the two originations have worked well to compliment each other and there is no visible remnant of the initial perception that SCIP was any sort of threat.

John Regener chomps at the bit to discuss CSI+SCIP, and automagic spefications

Discussed several business items such as online payment system to be developed.


Walt Marlow of CSI puts in a plug for partnering together with SCIP especially for educational programs, such as the CSI Academies

Manufacturer specks were discussed, as well as A/E spefications by project managers using semi-automagic tools. Education is increasingly important, to help deliver projects without increasing claims and change orders.

Greg Markling of CSI - We are looking for any and every way to work together with SCIP

By-laws revisions reviewed in general. Clarifications to language for affiliate membership, and added retired member status. Discussed whether to reduce the 5 year experience requirement for members, such as to 3 years in order to capture more full Members during the time when they really need SCIP the most, for mutual benefit. John Regener pointed out the Affiliate status was designed to be inclusionary, not exclusionary. Discussed proposed wording change to requirements for Affiliates, which would only require them to be full time specifiers who would not otherwise qualify as Members. Discussed allowing retired Affiliates to become Retired members.



Saturday, August 25, 2012

Tile cracked from deflection

Plywood subfloor, no cement backer board, large format tile - sure to crack.